Designs of bridges vary depending on the function of the bridge, the nature of the terrain where the bridge is constructed, the material used for construction and the funds available to build. With the advent of technology, the segmental construction of bridges became the need of the hour for almost every bridge and flyover construction across the globe. Rmbridge is a very powerful software for analyzing the aforementioned design requirements with beam elements, but it is not as efficient as some. Finley used lusas bridge for its engineering redesign of the estero parkway flyover in fort myers, florida for the contractor, zep construction. This time was selected on the basic of the past traffic study as an average of peak hour.
Waste minimization of construction materials on a bridge. Also it contains mix design as per indian code and pile cap specifications. Case study of flyover bridge and various problems and its solution 2. Proposed flyover bridge clover leaf junction top view clover leaf junction isometric view. A bridge is a construction built to span physical obstacles such as a body of water, valley, or road, for the purpose. Were confident that we can live up to high expectations, and.
In addition to this, during construction of the bridge, we established practices for traffic control in. The story is based on a scrum alliance article entitled a reallife example of agile, incremental. The primary goal of construction unit is to complete the work as specific on schedule with correct utilization of all the resources like man. Tubun flyover bridge launching nose essentially, the incremental launching method is worthy of consideration for project sites which face challenges such as. The platform has evolved and expanded to meet the estimating and operations requirements of the transportation sector. First of all, the alignment of the flyover is laid out and the pier and abutment locations are. Schedule of construction based critical path method cpm be prepared along with major milestone and bar charts. There are various kinds of launching gantries available, the choice of which depends. It describes the result of creativityof originality of thinking out of the box. The factors which had major effect on the material wastage were identified. The software rm bridge was chosen for the analysis of the ramp bridges because of its capabilities of analyzing staged construction, composite behavior, and time dependencies in all three dimensions. Latest software management tool can be used for this in case of a major bridge project. Construction of a flyover across five roads in salem. It includes the specialized balanced cantilever tool for easier generation of construction sequences for segmental bridges and rm cast tool for setting up segment geometry in the casting yard.
Pdf using nonlinear vibration techniques to detect damage in concrete bridges may 9 pdf preliminary design and multicriteria analysis of solutions for widening an. In a large majority of cases, segmental construction has been the winner. The launching gantries are deployed either on top or below the superstructure to carry forward the construction at ease of speed. Get an extensive lists of construction estimating, construction takeoff, construction management and bidding software for home builders, remodelers, specialty contractors and general contractors. However planning, design, construction, and erection of flyover consume great span of time. As far as the secondlevel flyover is concerned, of the 32 spans, 26 have been completed. Kansas department of transportation bridge construction manual version 1011 kdot bridge section 1. Under ground water tank analysis and designing by staad pro v8i software duration. The construction is being executed by the up state bridge corporation and the gda together at a cost of rs 45 crore, according to gupta. The flyover bridge is 8111m length and its scheduled to 988 days. The project was building a flyover road at a hugely busy intersection in bangalore, india. The scope of the study is limited to the following. This is a reallife example of the scrum process in action with construction.
The design of a main road bridge is critically addicted to standards and criteria. In this presentation, the piles foundation along with the equipments used at construction site are discussed. Steep slopes or deep valleys which make delivery of materials difficult, deep water. Bridge construction manual guidelines to project supervisors bridge engineering page 3 revision. Flyover construction in bangalore a reallife scrum. Moreover, we have also found remedial solutions to. Bridge design, analysis, construction software rm bridge. The goal of this project was to implement our research though a hands on design and derive an analysis of construction and life.
This books covers the entire gamut of bridge engineering investigation, design, construction and maintenance of bridges. The total length of flyover is 320m and width of 8m. Pdf recent trends in design and construction of flyovers. A flyover is basically a bridge that goes over the top of another portion of the roadway. The analysis of wastage is already done by mathematical method and this paper involves analysis by correlation and regression using spss16 software. Girder construction technology precast segmental box girder the bridge viaduct is divided into small segments, that are prefabricated in the good quality control casting yard, then, delivered. A bridge is a construction built to span physical obstacles such as a body of water, valley, or road, for the purpose of providing passage over the obstacle. City flyover construction road bridge builder for android. Request pdf a study of a flyoverbridge improved intersection to reduce traffic congestion at an atgrade intersection near a big city, one method is construction a flyover bridge at the old. The 48footlong bridge was constructed in about seven months by shirish patel at a cost of. Figure 2 available staging area for flyover construction bridge type selection four main evaluation criteria were used in the bridge type selection. Construction of railway overbridge civil engineering. Krishna raju, design of bridge fourth edition oxford and ibh publishing co. These books are used by students of top universities, institutes and colleges.
Delay analysis of flyover bridge construction using primavera. Chennai flyover grade separators interchange bridges. Bridge construction software bridge construction set v. The central span, which is the longest, at 40m length, and comes up over the junction, is nearing completion. This was a crossroads where many hightech companies had major facilities. The results obtained from this analysis are helpful in planning of skew bridge. Consulting engineers chicago, illinois one of the primary advantages of segmental concrete bridge construction is the economics. Construction software for the highway and transportation. A flyover is a construction built to span physical obstacles such as a body of water, valley, or road, for the purpose of providing passage over the obstacle. Tubun flyover bridge launching nose can be seen in fig. This manual is intended to better communicate the intent of the plans, standard specifications for state road.
Designs of flyover vary depending on the function of the flyover, the nature of the. This flyover would land around 190m ahead of the mrts bridge. As part of the six month summer training, this project that is the construction of railway over bridge in jalandhar punjab was undertaken by ishan kaushal. Pile as we know pile is a column of reinforced concrete which transfers the load of superstructure directly to the soil strata. The wbs dictionary for the construction works of flyover projects in this study is developed using archive analysis and survey methods, which consists of six 6 levels including project name. In doing so, finleys foursteel box girder design produced significant savings in construction costs over an initially proposed castinplace concrete box girder design. Rm bridge advanced extends rm bridge capabilities to nonlinear analysis, fem, pushover, and timehistory analysis, as well as high speed rail analysis.
Construction techniques for segmental concrete bridges. Completed construction of sangupiddy bridge on mannar pooneryn kerathivu road a32 completed construction of aruvi aru. Gai consultants used lusas bridge analysis software for detailed 3d analysis and comparison checking of the structure, and notably to. The development of riskbased standardized wbs work. Greater seismic resistance, life span, and lesser life cycle cost nullify the excess cost of construction of flyover. The objective of this study is to find out the different problems arising while and after construction. B2w software got its start with the firstever software application designed specifically for estimating heavy highway paving work. This animation shows all major processes involved in the construction of a concrete bridge made of concrete segments in a method called balanced cantilever. The two most costeffective curved systems for the area were posttensioned castinplace. Design of bridge is a post sanction in case of departmental construction and after tendering action in case of bridges throughout contract.
1009 421 97 770 50 407 19 1603 854 1160 268 1142 597 999 1113 1238 595 453 1354 492 1031 1167 315 822 156 1132 592 1152 549 1459 32 331 1116 1437 180 54 143 1436 624 223 1466 877 1047 566 1256 410 678 510 1242 103 210